Multifunctional Complex EXPO 2027 Planned Next to National Stadium in Surcin – Pavilions, Exhibition Halls, Pools and Hotels and Other Features Envisaged on 113 ha
![](/uploads/images/v5/lnSep.png)
![](/uploads/images/v5/lnSep.png)
![](https://www.ekapija.com/thumbs169/expo_2027_191022_tw1024.png)
It is reminded that, in June this year, Serbia applied Belgrade as a candidate for hosting the EXPO 2027 event with the topic of “Play for Humankind – Sports and Music for All”.
It is also said that, in June, the Government of Serbia adopted the decision by which the Project of the construction of facilities to the end of the realization of the international specialized show EXPO BELGRADE 2027, with the accompanying features, was pronounced a project of significance for the Republic of Serbia.
– The main goal is to define, in planning terms, the conditions for the realization of the EXPO 2027 complex as a multifunctional space meant for the organization of international events of the highest importance for the Republic of Serbia – the document says.
The area covered by the Spatial Plan encompasses the part of Surcinsko Polje to the east of the Belgrade Bypass Route and to the south of the location of the National Football Stadium.
EXPO 2027 will encompass three units:
1. an exhibition space with pavilions and accompanying features (multifunctional halls, congress halls, conference halls, traffic and infrastructure surfaces)
2. auxiliary accommodation capacities for the needs of the participants in the event
3. auxiliary commercial features for the participants and visitors of the event
On 830,000 m2 of the exhibition space, a multifunctional space for exhibitions and congresses of the highest state importance is planned. The main feature of spatial development is the central promenade which will connect the pavilions (exhibition halls) arranged in a row, leading to the big round square, where the main thematic pavilion and the national pavilion of Serbia will be located.
The construction of a hotel and an apartment hotel on 69,336 m2 is planned within the unit meant for accommodation capacities, whereas commercial features will spread on 229,105 m2.
The plan also envisages the connecting of the complex on several sides to various modes of transport – the existing Vojvodjanska Street, the Belgrade Bypass Route and the fast route New Belgrade-Surcin, the Nikola Tesla Airport through the planned BG Voz line (line 4), whereas the plan for the location for the setting up of floating structures on water terrain in the territory of Belgrade provides the possibility of connecting with the Belgrade center by water traffic.
B. Petrovic
![Ministarstvo građevinarstva, saobraćaja i infrastrukture Republike Srbije](/logo/148600_logo.gif)
![Urbanistički zavod Beograda](/logo/70895_logo.gif)
![Vlada Republike Srbije](/logo/92124_logo.gif)
Naš izbor
Most Important News
07.05.2024. | IT, Telecommunications
Biggest Angular conference in the region – NG Belgrade Conf 2024
![](https://www.ekapija.com/thumbs169/ng_belgrade_conf_2024_1_070524_tw630.jpg)
06.05.2024. | Healthcare
Medical doctors and engineers from Nis design instrument which accelerates and improves efficiency of operating procedures – Negotiating with foreign companies about production
![](https://www.ekapija.com/thumbs169/operacija_070815_tw630.jpg)
06.05.2024. | Healthcare
06.05.2024. | Construction, Tourism, Sports, Culture, Healthcare
Sijarinska Banja should soon get a new look – Project documentation for reconstruction of rehabilitation center complex being prepared
![](https://www.ekapija.com/thumbs169/specijalna_bolnica_gejzer_sijarinska_banja_090323_tw630.jpg)
06.05.2024. | Construction, Tourism, Sports, Culture, Healthcare
04.07.2024. | Industry, Transport
Chinese Minth Holdings to build factory for production of electric vehicles in Indjija – Investment of EUR 870 million and jobs for 2,200 workers planned in next 10 years
![](https://www.ekapija.com/thumbs169/automobili_proizvodnja_200815_tw630.jpg)
04.07.2024. | Industry, Transport
07.05.2024. | Industry, Construction
New Palfinger factory in Nis to start working in June
![](https://www.ekapija.com/thumbs169/palfinger_fabrika_nis_170523_tw630.jpg)
07.05.2024. | Industry, Construction
04.07.2024. | Industry, Construction, Transport
First passengers announced for summer 2019, haven’t bought tickets yet – Seven years from signing of agreement on joint construction of BAS
![](https://www.ekapija.com/thumbs169/autobuska_stanica_novi_beograd_030324_tw630.jpg)
04.07.2024. | Industry, Construction, Transport