Preliminary Feasibility Study and General Project of E70 Highway from Pancevo to Romanian Border Being Prepared
According to the project task, the aim of the preparation of the documentation is to estimate the economic and social potentials of the development of a traffic connection with Romania, through the construction of the part of the highway from Pancevo, through Vrsac, to the border.
It is added that the future route of the highway is the continuation of the future bypass route around Belgrade (Dobanovci-Ostruznica-Bubanj Potok-Vinca-Pancevo) and that it will be the shortest road connection of Romania, through Serbia and Montenegro, with Corridor X and south Italy and Albania, that is, with the Mediterranean basin. In the internal traffic system, the highway will connect the economy of south Banat with Belgrade, central regions of Serbia, Montenegro and the Port of Bar.
The planning documentation for the new highway and the network of traffic routes should entail the preparation of time projections, the theme of the planning of the transport system, the general plan of the spatial level compared to Serbia and Europe and the plan of the gravitational area pertaining to regions and municipalities.
Based on this planning documentation, which will define the potential location of the corridor, the general project will be prepared, which will further define the sections and the phases of the construction.
The value of the preparation of the project documentation for the E70 highway is RSD 75 million.
Most Important News
07.05.2024. | IT, Telecommunications
Biggest Angular conference in the region – NG Belgrade Conf 2024
06.05.2024. | Healthcare
Medical doctors and engineers from Nis design instrument which accelerates and improves efficiency of operating procedures – Negotiating with foreign companies about production
06.05.2024. | Healthcare
06.05.2024. | Construction, Tourism, Sports, Culture, Healthcare
Sijarinska Banja should soon get a new look – Project documentation for reconstruction of rehabilitation center complex being prepared
06.05.2024. | Construction, Tourism, Sports, Culture, Healthcare
05.07.2024. | Construction
What will the big aquarium in Usce look like? – Building of 5,000 m2 to be located underground and have a glass façade facing the Great War Island
05.07.2024. | Construction
07.05.2024. | Industry, Construction
New Palfinger factory in Nis to start working in June
07.05.2024. | Industry, Construction
04.07.2024. | Industry, Transport
Chinese Minth Holdings to build factory for production of electric vehicles in Indjija – Investment of EUR 870 million and jobs for 2,200 workers planned in next 10 years
04.07.2024. | Industry, Transport